"I don't just run sites. I recover them."
6+ years delivering luxury villas, commercial showrooms and large-scale residential towers across UAE, Egypt and Kenya. Proven on a AED 50M flagship in Abu Dhabi — from piling to handover.
Four flagship projects across the Gulf and East Africa — each with full responsibilities and site detail.
Project Engineer — URUK Construction
Commercial flagship combining reinforced concrete and structural steel, aluminium & glass façades, skylights, steel canopies and high-end interior finishing. Managed 80–150 workers daily across 10+ active trades — sole site engineer alongside the PM, from piling completion to handover. 32 NCRs closed at handover, zero open.
Project Engineer — URUK Construction
Commercial flagship combining reinforced concrete and structural steel, aluminium & glass façades, skylights, steel canopies and high-end interior finishing. Managed 80–150 workers daily across 10+ active trades — sole site engineer alongside the PM, from piling completion to handover. 32 NCRs closed at handover, zero open.
Full case study →
Project Engineer — URUK Construction
Joined a project 4 years behind schedule. First action: full scope inventory covering remaining works, pending approvals, stalled materials and contractor status. Stabilised execution, resolved critical municipal approval for post-tension extension, and recovered the programme — with minimum losses and no legal exposure.
Full case study →
Site Engineer — Makkah Constructions
Progressed from 8 buildings to full responsibility for all 36 towers, including periods of sole site authority during PM absence. Supervised structural and finishing works across multiple simultaneous fronts while maintaining consultant coordination and QA/QC compliance.
Full case study →
Site Engineer — Smarkit Company
Multi-storey residential towers including RC structural works, blockwork and finishing. Managed site setup, surveying and setting-out, quality control and daily coordination with local subcontractors — delivering under international and cross-cultural conditions.
Full case study →The approach doesn't change. The application does.
I start with vendor lists, material approvals and site setup running in parallel — so by the time groundworks begin, the approval chain is already moving. A clean start is the only protection against the firefighting that comes later.
I read the drawings, check where approvals stand, assess subcontractor status and identify what's actually blocking progress — not what looks like it is. Then I close gaps in the right order, not the most visible one.
Full scope inventory first: remaining works, pending approvals, stalled deliveries, contractor disputes, live risks. That picture tells me what to fix, what to absorb, and what to escalate. I've done this on a villa 4 years behind schedule. We stabilised it, recovered the critical path, and handed over — with minimum losses and no legal exposure.
I'm a Civil / Project Engineer based in Abu Dhabi with 6+ years of hands-on experience in site execution, high-end finishing, structural coordination and QA/QC. I've delivered projects across the UAE, Egypt and Kenya — targeting opportunities across the Gulf region and international markets.
My work focuses on bridging the gap between drawings and execution — ensuring details are built correctly, technical issues are closed fast, and quality stays consistent from mobilisation to handover. Strong documentation discipline — RFIs, WIRs, MIRs, shop drawing review and progress reporting — is a default, not an afterthought.
Whether it's a flagship commercial showroom, a luxury villa or a multi-tower residential development, I apply the same approach: clear planning, disciplined control, and a delivery-first mindset.
Selected academic and professional certificates. View full list or request copies.
Project Engineer and Site Engineer roles — UAE, Saudi Arabia and international markets. WhatsApp is fastest for role discussions and shortlist reviews.
Download a PDF copy of my CV and full portfolio for offline review or forwarding.